Summer 2025 -Work in Progress

 
 

Big change in plans, we are not going install the masts and rigging, we are just going to motor everywhere. Most sail boats going up to Alaska motor anyway. We are getting too old to mess around we need to get our asses out there and up north.
Work to be done this season.
  1. Rope work on poop deck handrail stanchions.
    Need to install the new supports first.


  2. Cover the main support post in the galley with fancy rope work.



  3. Mount Hypo valve in head so the urine drains into the gray water tank

  4. Aft Helm. Install new engine control cables throughout the ship.


  5. Solar Panels

  6. New lids for aft lockers.

  7. Install 1.5" zinc on rudder shaft. Missed this along the way !

  8. Radar

  9. Mount a pole on the deck for the Radar Dome.

  10. Aft deck rail supports.
    Add supports for aft deck rails which connect the uprights to the side of the ship. 16" bend 2" on each end.


  11. Replace Starboard Side Stairs (Took to AZ)


  12. Fancy wood work where aft cabin meets the cap rail.
    Took the "Whale's Tails" side pieces to AZ for rebuilding.