20-May-99 Shows the construction of the cap rail, some fairing on the aft port side, and the floor cut outs for the engine mounts. The hull pulled in about an inch when it cured. 17-Aug-99 Progress report for the whole ship.
   
06-Sep-99 Ken & Joe helping with the canvas work canvas work. Both have since passed away and they will always be remembered. 09-Sep-99 This is the September progress report showing the skeg work, pilot house, etc.
   
14-Sep-99 Canvas On 14-Sep-99 Pre-christening adventure with Ken and Joe.
   
22-Oct-99 Below Decks 05-Nov-99 Tarp Off.
   
12-Nov-99 Settee Design 12-Nov-99 Tarp On.