Aft deck rail supports.
Add supports for aft deck rails which connect the uprights to the side of the ship. 16" bend 2" on each end.
- Rope work on poop deck handrail stanchions.
Need to install the new supports first.
Cover the main support post in the galley with fancy rope work.
Aft Helm.
Install new engine control cables so we can run the engine switching to/from the pilot house and aft deck.
Install 1.5" zinc on rudder shaft. Missed this along the way !
Fancy wood work where aft cabin meets the cap rail.
Refinish all the wood work, rub rail and brow over windshield.
All new labels for the pilot house helm, switches and controls.
|