Behind the workbench I needed a storage area for hardware, etc. Once on the water there are no stores so I have to guess what I'll need for repairs.
Attached to the side and facing the galley is going to be the pantry.
So we one set facing the work bench and the other set facing into the galley.
So the first operation is to measure it out and remove the floor sections.
The pantry has a jog in it so it will be a little deeper then my workshop shelves due to the door opening to the v-berth.
Here are the supports for the shelves attached to the side of the fridge box.
Side pieces being roughed in.
Back of the pantry is in place and you can see the shop shelves are done, just need the sliding doors in place.
Sliding doors in place. Yeah !! The work shop section is finished !
Heres the galley pantry side with the shelf brackets all in place ready to varathane.
Gnettie has finished the varathan application and it's now ready for the shelves to be installed.
Shelves are all installed. I used aluminum angle to fit under the shelves to add support to the front of the shelf and also provide a ledge so things can't fall out. Now for the outside trim and sliding doors !
Top view, sliders all done.
Bottom view, sliders all done.
Top view with open slider. Gnettie has no slip shelf lining already installed.