The top of the workshop has been done for a long time. Now it is time to finish it off with drawers and cabinets.
|
|
|
This is the left side under the work bench. It needs the ceilings installed. I found enough cedar tongue and groove to do both sides. |
Here I have started the process. The left side has no supports for the straps of wood, so I have to install little blocks of wood as I go. About 1/2 way done on this side. |
|
|
|
|
Here they are, all done ! |
Shelving Braces are in and the drawers are roughed in.
You can also see the cabinet door tracks are installed.
Had to put the drawers on hardwood tracks. |
|
|
|
|
Shelves and drawers are in with the fancy wood trim around. |
Side wall before covering. Each area on the side walls have a 12VDC source. |
|
|
|
|
Here it is finally completed after 3-4 weeks. |
|
|
|