Work Shop - 2012

The top of the workshop has been done for a long time. Now it is time to finish it off with drawers and cabinets.
This is the left side under the work bench. It needs the ceilings installed. I found enough cedar tongue and groove to do both sides. Here I have started the process. The left side has no supports for the straps of wood, so I have to install little blocks of wood as I go. About 1/2 way done on this side.
   
Here they are, all done ! Shelving Braces are in and the drawers are roughed in.
You can also see the cabinet door tracks are installed.
Had to put the drawers on hardwood tracks.
   
Shelves and drawers are in with the fancy wood trim around. Side wall before covering. Each area on the side walls have a 12VDC source.
   
 
Here it is finally completed after 3-4 weeks.