|
|
Bow with part of the cover and scaffolding I made out of the hull mold. |
Starting to work on closing in the hull over the aft cabin. |
|
|
|
|
4 X 4 beams. Athwart ship beams cut on a curve. |
Aft section make it strong to support the mizzen mast. |
|
|
|
|
View from aft cabin. You can also see the future hatch opening. |
Aft cabin ribs being roughed in. I made an 8' mold to manufacture the fiberglass ribs. |
|
|
|
Cabin top getting closed in. |
|
|